V&A Stratford, E20
Value £500,000.00.
The base build of V&A was completed in 2023, whilst the fit out phase is scheduled for early 2024.
The new Stratford V&A building built over 6 main levels, will house exhibits throughout the 4 display floors Levels 1 to 4.
The design for this project was a challenge as the water supplies were installed on the roof.
The project consists of the design, supply, installation and commissioning of the base build system.